Aircraft Maintenance Tracking Spreadsheet Template

A controlled starter workbook—and a field guide for extending it—without turning a planning formula into a statement of maintenance status.

Maintenance template 11 sections · 6 min read Published July 27, 2026 · Updated July 27, 2026

In brief

A maintenance tracking spreadsheet can support planning and review when it preserves aircraft identity, task applicability, accomplishment evidence, every controlling due basis, calculation logic, exceptions, and approval history. It should not be treated as the source record or an automatic airworthiness determination.

Tools for this decision

Run the numbers while you read.

See all aircraft tools
Aircraft Maintenance Tracking Spreadsheet Template editorial illustration

A maintenance spreadsheet should answer five questions without guesswork:

  1. What requirement or task applies?
  2. What source proves the last accomplishment?
  3. Which clock controls the next due point?
  4. What remains before that limit?
  5. Who reviewed the conclusion, and when?

The spreadsheet is a control layer, not a substitute for maintenance entries, work packages, approved programs, current regulatory sources, or qualified technical judgment.

What the download contains

The downloadable starter has five worksheets. It is intentionally a controlled baseline, not a preloaded maintenance program or complete component-tracking system.

What the download contains
Downloaded sheetWhat it supportsImportant boundary
Start HereInstructions and limitationsDoes not authorize a maintenance program
Aircraft StatusAircraft identity, status date, and current airframe/engine inputsOne-aircraft snapshot, not utilization history
Due ItemsCalendar-, hour-, and cycle-based planning rows and remaining formulasUser must supply applicability, intervals, and last-complied facts
Evidence IndexSource identity, link, limitation, and reviewerA link does not prove the source is sufficient
Exception LogOpen questions, consequence, action, owner, and accepted limitationAcceptance authority comes from the operation, not the workbook

For an operation that needs serialized-component history, a dedicated AD register, recurring utilization observations, or field-level change history, add controlled worksheets or move to a purpose-built system. Do not assume those functions are already in this starter.

Aircraft Status: identity and current inputs

The downloaded Aircraft Status sheet records one aircraft baseline. Complete the fields from current source evidence:

Aircraft Status: identity and current inputs
FieldEntry instruction
RegistrationCurrent registration mark; do not use as the only identifier
Manufacturer and modelExact designation used by the controlling program
Serial numberVerify the manufacturer serial number against authoritative aircraft records
Status dateDate and time through which the entered utilization is current
Airframe hours/cyclesSource-stated or controlled derived totals
Engine hoursEnter against the correct installed engine identity
EvidenceRecord the observation in Evidence Index

The starter is not an installation-history ledger. If an engine or other serialized asset changes, preserve the superseded workbook and maintain a separate installation/removal record rather than overwriting history without a trace.

Extend it when utilization history matters

The download holds a current snapshot, not a row-by-row utilization log. Add a separate controlled sheet when you need chronology:

``text Observation ID | Aircraft/asset ID | Reading date | Aircraft hours | Aircraft cycles | Engine hours/cycles | APU hours/cycles | Other meter | Source document/link | Entered by | Reviewed by | Review date | Notes ``

Keep source-stated values separate from calculated values. If a reading is estimated or reconstructed, label the method and uncertainty rather than presenting it as observed fact.

Add validation rules for:

  • Reading dates that move backward.
  • Hours or cycles below the previous accepted observation.
  • An engine reading attached to the wrong serial number.
  • A long gap between observations.
  • Missing or inaccessible source evidence.

Due Items: what the formulas do

The downloaded Due Items sheet contains these fields:

``text Item ID | ATA/system | Requirement | Authority/source | Basis | Interval | Last date | Last hours | Last cycles | Next date | Next hours | Next cycles | Remaining calendar days | Remaining hours | Remaining cycles | Status/reviewer note ``

The workbook calculates only the remaining arithmetic after the user enters current utilization and source-supported next-due limits. It does not calculate applicability, create a task interval, authorize tolerance, or decide whether a last-complied record is acceptable.

If your program requires applicability rationale, work-package assignment, forecast date, reviewer approval, or position-level control, add explicit fields rather than burying them in the status note.

Due logic without hidden assumptions

For each driver:

remaining hours = next due hours − current hours

remaining cycles = next due cycles − current cycles

remaining calendar = next due date − current date

The operational due point remains each entered hard limit. A forecast may identify which limit is expected first, but the downloaded workbook does not convert days, hours, and cycles into one controlling forecast.

If tolerance or grace is permitted, keep the base due and any authorized adjusted due in separate columns. Cite the authority and approval. Never add a generic percentage to every task.

Tracking Airworthiness Directives

The starter does not include a dedicated AD worksheet. A limited user can create separate Due Items rows and link evidence, but an AD review should preserve these additional fields in a controlled register or purpose-built system:

``text AD number/revision | Product | Applicability conclusion | Rationale | Affected asset | Required action | Method of compliance | Evidence | One-time/recurring | Last accomplishment | Next due by each driver | AMOC reference if applicable | Current-source review date | Reviewer | Exception ``

A spreadsheet match on make and model does not determine applicability. Serial range, configuration, installed articles, prior action, and the AD’s actual text may control. For U.S. review, use the FAA’s Dynamic Regulatory System; use the competent authority’s current source for another jurisdiction.

When components need their own register

The downloaded starter has no serialized-component ledger. Do not compress a complex engine, LLP, landing-gear, or rotable history into one Due Items row. A separate controlled register should capture:

  • Nomenclature, part number, and serial number.
  • Installed position and host asset.
  • Birth or prior-history evidence.
  • Life limit and controlling unit.
  • Accumulated life at installation.
  • Host utilization since installation.
  • Current accumulated life and remaining life.
  • Installation and removal sources.
  • Release or trace documents.
  • Repair, modification, and overhaul history.
  • Evidence status and exception ID.

Do not calculate remaining life across an unsupported history segment as though it were verified. The life-limited parts guide explains the source chain in more detail.

Exception Log

Use a real exception register:

Exception Log
FieldExample of what to record
Exception IDStable identifier, never row number alone
Affected task/assetExact link to status row
IssueMissing entry, conflicting time, unreadable page, uncertain applicability
Evidence reviewedDocuments and searches completed
ConsequencePlanning uncertainty, review required, status unsupported
Interim treatmentHold, conservative assumption, inspection, research
Owner and due dateNamed accountable person
DispositionResolution, acceptance, or escalation with approval

The spreadsheet should show uncertainty, not make it disappear.

Review and change control

Require a second-person review for material baseline changes. The change log should record:

``text Change ID | Date | Sheet/record ID | Field changed | Previous value | New value | Reason | Source | Changed by | Reviewed by | Approval date ``

The starter does not contain a dedicated change-log worksheet. Preserve issued workbook versions or add a controlled change log before using it as a recurring status process. Test backups, control access, and periodically prove that source links still open. FAA AC 120-78B provides current guidance for electronic recordkeeping systems where applicable; its guidance is not itself a regulation and does not replace the rules or approvals governing a particular operation.

Go-live acceptance checklist

  • [ ] Every installed asset has stable identity.
  • [ ] Program and revision are defined.
  • [ ] All task applicability decisions are reviewed.
  • [ ] Last-accomplishment values link to source.
  • [ ] Calendar, hours, and cycles are separate.
  • [ ] Formula cells are locked and tested.
  • [ ] AD list was reviewed against a current FAA source.
  • [ ] Life-limited parts retain source traceability.
  • [ ] Exceptions have owners and dispositions.
  • [ ] Changes retain reviewer history.
  • [ ] Backups and exports were restored in a test.
  • [ ] Users know the tracker does not itself approve return to service.

Sources and further reading

Common questions

Frequently asked questions

Can I track aircraft maintenance in a spreadsheet?

A spreadsheet can support planning and reconciliation for a limited operation if it is controlled, reviewed, backed up, and linked to source records. The operator remains responsible for meeting applicable requirements, and complexity may make a purpose-built controlled system more appropriate.

What columns should an aircraft maintenance tracker include?

At minimum include aircraft or component identity, task ID and revision, applicability, interval and controlling driver, last accomplishment, next due, remaining amount, source evidence, calculation method, status, exception, owner, and review history.

Is the spreadsheet the official maintenance record?

Not necessarily. A tracker is often a status and planning layer. Required maintenance entries and retained records must still meet the applicable rules and procedures, and each tracker conclusion should link to its controlling evidence.

How often should the maintenance tracker be updated?

Update it when utilization posts, maintenance is accomplished, an applicable requirement changes, configuration changes, or an exception is resolved. The organization should define review and approval intervals appropriate to its operation.

Run maintenance from connected evidence

Know what is due—and open the record that proves it.

Radar connects maintenance status, component history, compliance work, and source records across every tail in the fleet.

Your fleet's records at your fingertips.

Sign up, print a label, and search your first tail within days. Free.

Aircraft Maintenance Tracking Spreadsheet Template

A controlled starter workbook—and a field guide for extending it—without turning a planning formula into a statement of maintenance status.

Maintenance template 11 sections · 6 min read Published July 27, 2026 · Updated July 27, 2026

In brief

A maintenance tracking spreadsheet can support planning and review when it preserves aircraft identity, task applicability, accomplishment evidence, every controlling due basis, calculation logic, exceptions, and approval history. It should not be treated as the source record or an automatic airworthiness determination.

Tools for this decision

Run the numbers while you read.

See all aircraft tools
Aircraft Maintenance Tracking Spreadsheet Template editorial illustration

A maintenance spreadsheet should answer five questions without guesswork:

  1. What requirement or task applies?
  2. What source proves the last accomplishment?
  3. Which clock controls the next due point?
  4. What remains before that limit?
  5. Who reviewed the conclusion, and when?

The spreadsheet is a control layer, not a substitute for maintenance entries, work packages, approved programs, current regulatory sources, or qualified technical judgment.

What the download contains

The downloadable starter has five worksheets. It is intentionally a controlled baseline, not a preloaded maintenance program or complete component-tracking system.

What the download contains
Downloaded sheetWhat it supportsImportant boundary
Start HereInstructions and limitationsDoes not authorize a maintenance program
Aircraft StatusAircraft identity, status date, and current airframe/engine inputsOne-aircraft snapshot, not utilization history
Due ItemsCalendar-, hour-, and cycle-based planning rows and remaining formulasUser must supply applicability, intervals, and last-complied facts
Evidence IndexSource identity, link, limitation, and reviewerA link does not prove the source is sufficient
Exception LogOpen questions, consequence, action, owner, and accepted limitationAcceptance authority comes from the operation, not the workbook

For an operation that needs serialized-component history, a dedicated AD register, recurring utilization observations, or field-level change history, add controlled worksheets or move to a purpose-built system. Do not assume those functions are already in this starter.

Aircraft Status: identity and current inputs

The downloaded Aircraft Status sheet records one aircraft baseline. Complete the fields from current source evidence:

Aircraft Status: identity and current inputs
FieldEntry instruction
RegistrationCurrent registration mark; do not use as the only identifier
Manufacturer and modelExact designation used by the controlling program
Serial numberVerify the manufacturer serial number against authoritative aircraft records
Status dateDate and time through which the entered utilization is current
Airframe hours/cyclesSource-stated or controlled derived totals
Engine hoursEnter against the correct installed engine identity
EvidenceRecord the observation in Evidence Index

The starter is not an installation-history ledger. If an engine or other serialized asset changes, preserve the superseded workbook and maintain a separate installation/removal record rather than overwriting history without a trace.

Extend it when utilization history matters

The download holds a current snapshot, not a row-by-row utilization log. Add a separate controlled sheet when you need chronology:

``text Observation ID | Aircraft/asset ID | Reading date | Aircraft hours | Aircraft cycles | Engine hours/cycles | APU hours/cycles | Other meter | Source document/link | Entered by | Reviewed by | Review date | Notes ``

Keep source-stated values separate from calculated values. If a reading is estimated or reconstructed, label the method and uncertainty rather than presenting it as observed fact.

Add validation rules for:

  • Reading dates that move backward.
  • Hours or cycles below the previous accepted observation.
  • An engine reading attached to the wrong serial number.
  • A long gap between observations.
  • Missing or inaccessible source evidence.

Due Items: what the formulas do

The downloaded Due Items sheet contains these fields:

``text Item ID | ATA/system | Requirement | Authority/source | Basis | Interval | Last date | Last hours | Last cycles | Next date | Next hours | Next cycles | Remaining calendar days | Remaining hours | Remaining cycles | Status/reviewer note ``

The workbook calculates only the remaining arithmetic after the user enters current utilization and source-supported next-due limits. It does not calculate applicability, create a task interval, authorize tolerance, or decide whether a last-complied record is acceptable.

If your program requires applicability rationale, work-package assignment, forecast date, reviewer approval, or position-level control, add explicit fields rather than burying them in the status note.

Due logic without hidden assumptions

For each driver:

remaining hours = next due hours − current hours

remaining cycles = next due cycles − current cycles

remaining calendar = next due date − current date

The operational due point remains each entered hard limit. A forecast may identify which limit is expected first, but the downloaded workbook does not convert days, hours, and cycles into one controlling forecast.

If tolerance or grace is permitted, keep the base due and any authorized adjusted due in separate columns. Cite the authority and approval. Never add a generic percentage to every task.

Tracking Airworthiness Directives

The starter does not include a dedicated AD worksheet. A limited user can create separate Due Items rows and link evidence, but an AD review should preserve these additional fields in a controlled register or purpose-built system:

``text AD number/revision | Product | Applicability conclusion | Rationale | Affected asset | Required action | Method of compliance | Evidence | One-time/recurring | Last accomplishment | Next due by each driver | AMOC reference if applicable | Current-source review date | Reviewer | Exception ``

A spreadsheet match on make and model does not determine applicability. Serial range, configuration, installed articles, prior action, and the AD’s actual text may control. For U.S. review, use the FAA’s Dynamic Regulatory System; use the competent authority’s current source for another jurisdiction.

When components need their own register

The downloaded starter has no serialized-component ledger. Do not compress a complex engine, LLP, landing-gear, or rotable history into one Due Items row. A separate controlled register should capture:

  • Nomenclature, part number, and serial number.
  • Installed position and host asset.
  • Birth or prior-history evidence.
  • Life limit and controlling unit.
  • Accumulated life at installation.
  • Host utilization since installation.
  • Current accumulated life and remaining life.
  • Installation and removal sources.
  • Release or trace documents.
  • Repair, modification, and overhaul history.
  • Evidence status and exception ID.

Do not calculate remaining life across an unsupported history segment as though it were verified. The life-limited parts guide explains the source chain in more detail.

Exception Log

Use a real exception register:

Exception Log
FieldExample of what to record
Exception IDStable identifier, never row number alone
Affected task/assetExact link to status row
IssueMissing entry, conflicting time, unreadable page, uncertain applicability
Evidence reviewedDocuments and searches completed
ConsequencePlanning uncertainty, review required, status unsupported
Interim treatmentHold, conservative assumption, inspection, research
Owner and due dateNamed accountable person
DispositionResolution, acceptance, or escalation with approval

The spreadsheet should show uncertainty, not make it disappear.

Review and change control

Require a second-person review for material baseline changes. The change log should record:

``text Change ID | Date | Sheet/record ID | Field changed | Previous value | New value | Reason | Source | Changed by | Reviewed by | Approval date ``

The starter does not contain a dedicated change-log worksheet. Preserve issued workbook versions or add a controlled change log before using it as a recurring status process. Test backups, control access, and periodically prove that source links still open. FAA AC 120-78B provides current guidance for electronic recordkeeping systems where applicable; its guidance is not itself a regulation and does not replace the rules or approvals governing a particular operation.

Go-live acceptance checklist

  • [ ] Every installed asset has stable identity.
  • [ ] Program and revision are defined.
  • [ ] All task applicability decisions are reviewed.
  • [ ] Last-accomplishment values link to source.
  • [ ] Calendar, hours, and cycles are separate.
  • [ ] Formula cells are locked and tested.
  • [ ] AD list was reviewed against a current FAA source.
  • [ ] Life-limited parts retain source traceability.
  • [ ] Exceptions have owners and dispositions.
  • [ ] Changes retain reviewer history.
  • [ ] Backups and exports were restored in a test.
  • [ ] Users know the tracker does not itself approve return to service.

Sources and further reading

Common questions

Frequently asked questions

Can I track aircraft maintenance in a spreadsheet?

A spreadsheet can support planning and reconciliation for a limited operation if it is controlled, reviewed, backed up, and linked to source records. The operator remains responsible for meeting applicable requirements, and complexity may make a purpose-built controlled system more appropriate.

What columns should an aircraft maintenance tracker include?

At minimum include aircraft or component identity, task ID and revision, applicability, interval and controlling driver, last accomplishment, next due, remaining amount, source evidence, calculation method, status, exception, owner, and review history.

Is the spreadsheet the official maintenance record?

Not necessarily. A tracker is often a status and planning layer. Required maintenance entries and retained records must still meet the applicable rules and procedures, and each tracker conclusion should link to its controlling evidence.

How often should the maintenance tracker be updated?

Update it when utilization posts, maintenance is accomplished, an applicable requirement changes, configuration changes, or an exception is resolved. The organization should define review and approval intervals appropriate to its operation.

Run maintenance from connected evidence

Know what is due—and open the record that proves it.

Radar connects maintenance status, component history, compliance work, and source records across every tail in the fleet.

Your fleet's records at your fingertips.

Sign up, print a label, and search your first tail within days. Free.

Aircraft Maintenance Tracking Spreadsheet Template

A controlled starter workbook—and a field guide for extending it—without turning a planning formula into a statement of maintenance status.

Maintenance template 11 sections · 6 min read Published July 27, 2026 · Updated July 27, 2026

In brief

A maintenance tracking spreadsheet can support planning and review when it preserves aircraft identity, task applicability, accomplishment evidence, every controlling due basis, calculation logic, exceptions, and approval history. It should not be treated as the source record or an automatic airworthiness determination.

Tools for this decision

Run the numbers while you read.

See all aircraft tools
Aircraft Maintenance Tracking Spreadsheet Template editorial illustration

A maintenance spreadsheet should answer five questions without guesswork:

  1. What requirement or task applies?
  2. What source proves the last accomplishment?
  3. Which clock controls the next due point?
  4. What remains before that limit?
  5. Who reviewed the conclusion, and when?

The spreadsheet is a control layer, not a substitute for maintenance entries, work packages, approved programs, current regulatory sources, or qualified technical judgment.

What the download contains

The downloadable starter has five worksheets. It is intentionally a controlled baseline, not a preloaded maintenance program or complete component-tracking system.

What the download contains
Downloaded sheetWhat it supportsImportant boundary
Start HereInstructions and limitationsDoes not authorize a maintenance program
Aircraft StatusAircraft identity, status date, and current airframe/engine inputsOne-aircraft snapshot, not utilization history
Due ItemsCalendar-, hour-, and cycle-based planning rows and remaining formulasUser must supply applicability, intervals, and last-complied facts
Evidence IndexSource identity, link, limitation, and reviewerA link does not prove the source is sufficient
Exception LogOpen questions, consequence, action, owner, and accepted limitationAcceptance authority comes from the operation, not the workbook

For an operation that needs serialized-component history, a dedicated AD register, recurring utilization observations, or field-level change history, add controlled worksheets or move to a purpose-built system. Do not assume those functions are already in this starter.

Aircraft Status: identity and current inputs

The downloaded Aircraft Status sheet records one aircraft baseline. Complete the fields from current source evidence:

Aircraft Status: identity and current inputs
FieldEntry instruction
RegistrationCurrent registration mark; do not use as the only identifier
Manufacturer and modelExact designation used by the controlling program
Serial numberVerify the manufacturer serial number against authoritative aircraft records
Status dateDate and time through which the entered utilization is current
Airframe hours/cyclesSource-stated or controlled derived totals
Engine hoursEnter against the correct installed engine identity
EvidenceRecord the observation in Evidence Index

The starter is not an installation-history ledger. If an engine or other serialized asset changes, preserve the superseded workbook and maintain a separate installation/removal record rather than overwriting history without a trace.

Extend it when utilization history matters

The download holds a current snapshot, not a row-by-row utilization log. Add a separate controlled sheet when you need chronology:

``text Observation ID | Aircraft/asset ID | Reading date | Aircraft hours | Aircraft cycles | Engine hours/cycles | APU hours/cycles | Other meter | Source document/link | Entered by | Reviewed by | Review date | Notes ``

Keep source-stated values separate from calculated values. If a reading is estimated or reconstructed, label the method and uncertainty rather than presenting it as observed fact.

Add validation rules for:

  • Reading dates that move backward.
  • Hours or cycles below the previous accepted observation.
  • An engine reading attached to the wrong serial number.
  • A long gap between observations.
  • Missing or inaccessible source evidence.

Due Items: what the formulas do

The downloaded Due Items sheet contains these fields:

``text Item ID | ATA/system | Requirement | Authority/source | Basis | Interval | Last date | Last hours | Last cycles | Next date | Next hours | Next cycles | Remaining calendar days | Remaining hours | Remaining cycles | Status/reviewer note ``

The workbook calculates only the remaining arithmetic after the user enters current utilization and source-supported next-due limits. It does not calculate applicability, create a task interval, authorize tolerance, or decide whether a last-complied record is acceptable.

If your program requires applicability rationale, work-package assignment, forecast date, reviewer approval, or position-level control, add explicit fields rather than burying them in the status note.

Due logic without hidden assumptions

For each driver:

remaining hours = next due hours − current hours

remaining cycles = next due cycles − current cycles

remaining calendar = next due date − current date

The operational due point remains each entered hard limit. A forecast may identify which limit is expected first, but the downloaded workbook does not convert days, hours, and cycles into one controlling forecast.

If tolerance or grace is permitted, keep the base due and any authorized adjusted due in separate columns. Cite the authority and approval. Never add a generic percentage to every task.

Tracking Airworthiness Directives

The starter does not include a dedicated AD worksheet. A limited user can create separate Due Items rows and link evidence, but an AD review should preserve these additional fields in a controlled register or purpose-built system:

``text AD number/revision | Product | Applicability conclusion | Rationale | Affected asset | Required action | Method of compliance | Evidence | One-time/recurring | Last accomplishment | Next due by each driver | AMOC reference if applicable | Current-source review date | Reviewer | Exception ``

A spreadsheet match on make and model does not determine applicability. Serial range, configuration, installed articles, prior action, and the AD’s actual text may control. For U.S. review, use the FAA’s Dynamic Regulatory System; use the competent authority’s current source for another jurisdiction.

When components need their own register

The downloaded starter has no serialized-component ledger. Do not compress a complex engine, LLP, landing-gear, or rotable history into one Due Items row. A separate controlled register should capture:

  • Nomenclature, part number, and serial number.
  • Installed position and host asset.
  • Birth or prior-history evidence.
  • Life limit and controlling unit.
  • Accumulated life at installation.
  • Host utilization since installation.
  • Current accumulated life and remaining life.
  • Installation and removal sources.
  • Release or trace documents.
  • Repair, modification, and overhaul history.
  • Evidence status and exception ID.

Do not calculate remaining life across an unsupported history segment as though it were verified. The life-limited parts guide explains the source chain in more detail.

Exception Log

Use a real exception register:

Exception Log
FieldExample of what to record
Exception IDStable identifier, never row number alone
Affected task/assetExact link to status row
IssueMissing entry, conflicting time, unreadable page, uncertain applicability
Evidence reviewedDocuments and searches completed
ConsequencePlanning uncertainty, review required, status unsupported
Interim treatmentHold, conservative assumption, inspection, research
Owner and due dateNamed accountable person
DispositionResolution, acceptance, or escalation with approval

The spreadsheet should show uncertainty, not make it disappear.

Review and change control

Require a second-person review for material baseline changes. The change log should record:

``text Change ID | Date | Sheet/record ID | Field changed | Previous value | New value | Reason | Source | Changed by | Reviewed by | Approval date ``

The starter does not contain a dedicated change-log worksheet. Preserve issued workbook versions or add a controlled change log before using it as a recurring status process. Test backups, control access, and periodically prove that source links still open. FAA AC 120-78B provides current guidance for electronic recordkeeping systems where applicable; its guidance is not itself a regulation and does not replace the rules or approvals governing a particular operation.

Go-live acceptance checklist

  • [ ] Every installed asset has stable identity.
  • [ ] Program and revision are defined.
  • [ ] All task applicability decisions are reviewed.
  • [ ] Last-accomplishment values link to source.
  • [ ] Calendar, hours, and cycles are separate.
  • [ ] Formula cells are locked and tested.
  • [ ] AD list was reviewed against a current FAA source.
  • [ ] Life-limited parts retain source traceability.
  • [ ] Exceptions have owners and dispositions.
  • [ ] Changes retain reviewer history.
  • [ ] Backups and exports were restored in a test.
  • [ ] Users know the tracker does not itself approve return to service.

Sources and further reading

Common questions

Frequently asked questions

Can I track aircraft maintenance in a spreadsheet?

A spreadsheet can support planning and reconciliation for a limited operation if it is controlled, reviewed, backed up, and linked to source records. The operator remains responsible for meeting applicable requirements, and complexity may make a purpose-built controlled system more appropriate.

What columns should an aircraft maintenance tracker include?

At minimum include aircraft or component identity, task ID and revision, applicability, interval and controlling driver, last accomplishment, next due, remaining amount, source evidence, calculation method, status, exception, owner, and review history.

Is the spreadsheet the official maintenance record?

Not necessarily. A tracker is often a status and planning layer. Required maintenance entries and retained records must still meet the applicable rules and procedures, and each tracker conclusion should link to its controlling evidence.

How often should the maintenance tracker be updated?

Update it when utilization posts, maintenance is accomplished, an applicable requirement changes, configuration changes, or an exception is resolved. The organization should define review and approval intervals appropriate to its operation.

Run maintenance from connected evidence

Know what is due—and open the record that proves it.

Radar connects maintenance status, component history, compliance work, and source records across every tail in the fleet.

Your fleet's records at your fingertips.

Sign up, print a label, and search your first tail within days. Free.